Water Line

Peniel Bible Camp has always used its own well water that required iron removal and softening. In the past, the EPA required quarterly testing of the water. It has always tested good. However, this spring additional requirements mandated weekly and then biweekly testing that became cost prohibitive. Because of these increased testing costs and increasing system maintenance, the Ohio Bible Mission authorized a camp connection to city water. The availability of a tap point on Shurr Rd enabled us to make the connection with 1200’ of pipeline. We did all the installation work from the street to our existing water system. We are thankful for a licensed plumber who gave of his time to finish the installation and enabled us to pass final inspection. City water began running throughout the camp on April 21, 2017 and is now ready for the summer camping season.

The total cost of the connection is $15,000.  The Ohio Bible Mission is asking churches and interested friends of the camp to consider helping with this cost during our Memorial Day Celebration at camp on May 26th.  Gifts can also be made through the link below or sent to Ohio Bible Mission,  103 Parkview Ave, Westerville, OH  43081.